In another image you can see how only six days earlier the crest of the shingle bank was twice as wide at the same height. During these 6 days we had no storms just wind runs of 60miles for 3 days. Shingle that has 'disappeared' from here probably will materialize along at Bracklesham Bay. I call this lateral drift. I do hope S.O.S. member John Napper who under the watchful, eyes of Roland and Co. extend the scientific survey on shingle movement, using their stones that are fitted with transponders. These in-turn are monitored and the recordings are subsequent plotted and mapped and can be viewed in programs as Google Earth, etc.
Environmental Agency, Managed Retreat, Medmerry, realignment, Selsey, Destruction, Manhood Penisular, sea defences, coastal protection, south coast
Showing posts with label Shingle. Show all posts
Showing posts with label Shingle. Show all posts
Thursday, 19 January 2012
Sunday, 15 January 2012
Medmerry beach in fantastic condition
Monday, 7 February 2011
BeachSavers Articulated Dumpers
This shingle is being reclaimed from the Bracklesham end of Medmerry. It has been washed off of our end of the beach and the lateral Westward drift has allowed its migration. Shame the groynes had been removed, otherwise this process need not have been employed. If the material had not been brought back there was a serious chance of 'over topping' or even breaching by the rough seas. Thankfully we are entering the waning days of the spring tides and the winds are easing.
Monday, 28 January 2008
Subscribe to:
Posts (Atom)
Once upon a time there were Groynes
Once upon a time there were Groynes
